Western Power Medical Centre Substation

IMG 0114

The scope of works is for the construction of the 132kV open-terminal switchyard, installation of 3x33MVA 132/66/11kV transformers, including the civil works for the enclosures. 

Construction of a switch room and relay room and installation of a three-section 11kV switchboard and control & protection equipment.

The contract works includes:

• Civil Works & Steelwork
• Primary Electrical Works
• Secondary Installation
• Quality Management And Reporting Requirements
• As Built Drawings And Documents

The appointment of Electrix to their substation panel and successful completion of this initial project has demonstrated the project management and substation construction capabilities of Electrix and provides Western Power with greater flexibility for awarding future substation contracts within their network area.