Boral Bricks Darra Plant Upgrade

Boral Bricks 4

Key Facts

Project: Boral Bricks Darra Plant Upgrade

Client: Boral Bricks Queensland

Location: Queensland

Duration: 2013

In order to undertake these works within a tight program window Electrix provided two experienced teams working closely with the Boral Management and engineering staff. The replacement of the two MCC’s presented some significant challenges around timely manufacture and delivery. Electrix and our partner supplier were able to design, engineer, manufacture and deliver the two MCC’s to site within a two week delivery window by working around the clock to meet the stringent Boral schedule.

For the Extruder and Clay preparation safety systems upgrade works Electrix was required to undertake safety audits and work closely with the Boral HAZOPS safety analysis committee to establish the correct safety category for the respective plant areas.

As a result of our efforts Boral Bricks Queensland have expressed their thanks for the expedient and professional way Electrix managed the project.

 

 

 

 Download Project PDF

Web Design by Bliss Media